In connection with the entry into force on December 7, 2016 of the Russian Government Decree No. 1245 of November 25, 2016 “On the procedure for limiting the supply (supply) and withdrawal of gas, on amending and invalidating certain acts of the Government Russian Federation", changes have been made to the Rules for gas supply to the Russian Federation.

List of documents submitted to the Supplier for concluding a gas supply agreement.

Copies of the documents provided for in this List must be certified by the persons who issued (drew up) such documents, or by a person authorized in accordance with the legislation of the Russian Federation to carry out actions to certify copies of such documents (for example, a notary), or the originals of these documents are provided for review and certification of their copies by an employee of Gazprom Mezhregiongaz Moscow LLC.

1. Letter - application on the organization’s letterhead addressed to the General Director of Gazprom Mezhregiongaz Moscow LLC Popov N.K. requesting a supply agreement natural gas, which indicates:

Full and abbreviated name legal entity(last name, first name, patronymic of an individual entrepreneur);

Bank details;

Estimated period and start date of gas supply;

Number and location (name) of connection points and gas-using equipment for each of them;

The volume of gas requested for supply for the entire expected period of the contract (or the annual volume of gas), broken down by month and quarter for each or all connection points ( sample 1).

2. Technical conditions for connection (technological connection) of the facility to the gas distribution network and a certificate indicating the source of gas supply to the GDS (gas distribution station), issued by the gas distribution organization - GRO (JSC Mosgaz, State Unitary Enterprise MO Mosoblgaz, JSC Gazprom Gazoraspredeleniye) .

3. An act of connection (technological connection) or an act of connecting a gas-consuming facility (equipment) to gas distribution networks through which gas can be supplied to the applicant. If the connection (technological connection) of the specified facility was carried out before the entry into force of Decree of the Government of the Russian Federation dated February 13, 2006 N 83 “On approval of the Rules for determining and providing technical specifications connecting a capital construction project to engineering and technical support networks and Rules for connecting a capital construction project to engineering and technical support networks."

The specified document is submitted as soon as the GRO is ready.

4. A copy of the calculation of the annual need for heat and fuel, completed design organization with the appropriate license.

5. Certificate of acceptance by the representative of Gazprom Mezhregiongaz Moscow LLC of the measuring complex (gas metering unit) as a commercial one.

6. Act on delimitation of ownership (balance sheet and operation) of the gas inlet pipeline.

7. Document confirming the establishment of gas consumption reservation (submitted if available).

8. Constituent documents legal entity or passport: individual entrepreneur/ individual owner of a non-residential property/rector of a temple - for religious organizations.

9. Certificate of state registration of a legal entity or certificate of state registration of an individual as an individual entrepreneur.

10. Evidence from tax office on tax registration (notarized copy). For individual entrepreneurs(individuals) - a copy of the certificate of registration with the tax authority of an individual at the place of residence.

11. A copy of the information letter (notification) about statistics codes (OKVED, OKPO, OKATO, etc.) from the territorial bodies of the State Statistics Service for Moscow or the Moscow Region.

12. Documents confirming the authority of persons to sign an agreement on behalf of the buyer:

Individually executive body(director): decision/protocol on the election (appointment) of a director (if the decision on election was made by the Board of Directors of the organization - also the protocol on the election of members of the Board of Directors), as well as an order on the appointment of a director;

According to the composition of participants - an extract from the Unified State Register of Legal Entities (USRIP), received no later than 30 days;

For another person - a power of attorney (with a certified sample signature) and the powers of the person who issued it.

13. Documents confirming that gas-using equipment (gas supply facilities) belongs to the applicant on the right of ownership or on another legal basis:

Certificate of ownership or extract from the Unified State Register of Real Estate (gas consuming facility);

Sales and purchase agreements for gas-consuming facilities and/or gas-using equipment, or other agreements confirming the emergence (or transfer) of ownership of these facilities;

Lease agreements, concessions or other agreements confirming the right of temporary ownership of a gas-consuming facility and/or gas-using equipment (long-term agreements must pass state registration UFRS);

Acceptance and transfer certificates for the above contracts, reflecting in them the object-by-object composition of gas-using equipment;

Powers of the persons signing the above agreements;

Other documents confirming the right of temporary ownership of a gas-consuming facility and/or gas-using equipment (in the case of the initial creation of the facility: a construction permit, an act of handing over a construction project, a permit to put the facility into operation, a receipt from the registration chamber on receipt of documents for registration of the right, a certificate or extract from the Unified State Register);

Technical data sheets for the specified gas-consuming equipment.

14. For enterprises financed from the budget of any level (federal, regional, local) confirmation of the Chief Administrator budget funds on the ability to fulfill contractual obligations within the limits established by the budget cash(extract from the budget list or other confirmation).

15. Documents confirming that the share of heat supply to the address budgetary institutions, whose activities are financed from the corresponding budget on the basis of estimates of income and expenses, state-owned enterprises, homeowners' associations, housing construction, housing and other specialized consumer cooperatives, management organizations or individual entrepreneurs carrying out management apartment buildings, V total volume of goods supplied by the buyer and services provided is more than 75 percent (represented by heat supply entities with the specified share of supplied thermal energy).

16. Documents confirming that the applicant belongs to the category of municipal and household consumers (if available).

17. Counterparty card on the organization’s letterhead with an outgoing number (form attached).

Mosgaz 2.0 On issuing technical specifications for the design of cutting and dismantling an external gas pipeline 2.1 - On issuing Mosgaz technical specifications for the design and modernization of a small boiler house No. 137 2.2 On issuing a notification to existing intersections along the route of laying a heating network 2.3 On issuing a notification for excavation work 2.4 About concluding an agreement for cutting the existing and inserting a newly laid gas pipeline 2.5 On issuing as-built and technical documentation for obtaining Certificate Form No. 6 and registering the balance sheet ownership of the facility by the Customer 2.6 On registering the project with OJSC Mosgaz 3.

Write a letter

SODK - operational remote control system 5. Technical inspection of building structures 6. RTS KTS MK technical re-equipment 7. Execution of construction installation work 8.


Attention

Collections base prices on design work for... 9. ITD | Executive and technical documentation 10. How to calculate the cost of heating in a workshop Archive of technical documentation TECHNICAL DOCUMENTATION Letters Attention! Before sending letters, be sure to check your full name. addressee in the relevant organization. Sample letters are advisory in nature. 1 Glavgosexpertiza 1.1 To Glavgosexpertiza about the examination project documentation 1.2 Letter of return from Glavgosexpertiza due to incompleteness of the provided documentation 2.

Write a letter to. V. Chemezov

Rostechnadzor reserves the right, in accordance with the established procedure, to clarify the accuracy of information about the sender of the request, as well as, if necessary, the content of the request. 5. The size of the request text should not exceed 5000 characters. Applications containing large texts, copies of documents, photographs and other acceptable attachments should be sent by regular mail to the address: 105066, Moscow, st. A. Lukyanova, 4, building 1 6. Information about the personal data of citizens who sent a request to electronic form, stored and processed in accordance with requirements Russian legislation about personal data.
7. In order to objectively and comprehensively consider your application to established deadlines It is necessary to indicate in the text of the appeal the address of the place of action, fact or event described by you, and you can also indicate a telephone number for possible clarification of the content of your appeal.

Feedback

Reception of complaints in writing is carried out by Rostechnadzor or its territorial bodies providing public services at the place where the public service is provided (directly at the place where the applicant submitted a request for a public service, the violation of the procedure of which is being complained about, or at the place where the applicant received the result of the specified public service). services). The time for receiving complaints coincides with the time for submitting public services, established by the work schedule of Rostekhnadzor or its territorial body. A written complaint may also be sent by mail. If a complaint is filed in person, the applicant presents a document proving his identity in accordance with the legislation of the Russian Federation. 5.

Complaints Procedure

Info

Uralvagonzavod has concluded a number of contracts for the supply of railway equipment, the largest of which is with FGK for the supply of 24,000 innovative gondola cars over three years. The President instructed the Ministry of Industry and Trade and the Ministry of Economic Development to study Rogozin’s proposals, says a federal official. Moreover, according to him, the issue was not initiated by Rostec, which “never knew about it.”


The official believes that this is the idea of ​​​​Rogozin’s apparatus. "The company is in dire financial condition“We have to do something,” he reasons. - What to do]? There is no money in the budget, so give it to someone who has it. Does Rostec make a profit? Let him take it. “Rostec doesn’t need this at all, but they said they would study the issue.”

Rogozin asked Putin to change the management of Uralvagonzavod

Yaroslavl regionSt. PetersburgRepublic of KareliaArkhangelsk regionKomi RepublicVologda regionKaliningrad regionLeningrad regionMurmansk regionPskov regionNovgorod regionNenets Autonomous RegionRepublic of AdygeaKrasnodar regionAstrakhan regionVolgograd regionRepublic of CrimeaRostov regionSevastopolRepublic of Dage stanRepublic of IngushetiaKabardino-Balkarian RepublicKarachay-Cherkess RepublicRepublic of North Ossetia-AlaniaChechen RepublicStavropol TerritoryRepublic of BashkortostanRepublic of Mari ElRepublic of MordoviaRepublic of TatarstanUdmurt RepublicChuvash RepublicKirov RegionNizhny Novgorod RegionOrenburg RegionPerm RegionPenza Region regionSaratov regionUlyanovsk regionKurgan regionSverdlovsk regionTyumen regionChelyabinsk regionKhanty-Mansiysk auto.

An example of writing letters to Rostekhnadzor, Mosgaz, Oati...

The Ministry of Defense has no complaints against Uralvagonzavod in terms of timely execution of contracts both for the supply of new and modernized equipment (MSTA-S self-propelled guns, T-72B3 tanks, etc.) and for the development of new ones (new Armata tank and Self-propelled gun "Coalition"), says a military department employee. But it should be borne in mind that the profitability of contracts with the Ministry of Defense is insignificant (less than 5%, and sometimes less than 3%) and they cannot correct the generally difficult economic situation of the holding. This is precisely what worries various departments, Vedomosti’s interlocutor continues.
«

Important

Rostec does not need to give away the entire Uralvagonzavod, says General Director of Infoline Analytics Mikhail Burmistrov. This will negatively affect the development of railway and tank production. The state corporation has no experience in car building, but the Uralvagonzavod brand is recognizable in the domestic and foreign markets, Burmistrov emphasizes.

Samples of applications to Rostekhnadzor

Rogozin's representative declined to comment. His colleagues from the Ministry of Industry and Trade and Rostec did not respond to Vedomosti’s request. Putin's press secretary Dmitry Peskov could not be reached last night. A representative of Uralvagonzavod said that he knew nothing about Rogozin’s letter.

At the end of the first half of 2016, Uralvagonzavod’s net debt amounted to 276 billion rubles. with revenue of 43.1 billion, Uralvagonzavod expected to attract government guarantees worth 16 billion rubles. and receive additional capitalization from the budget. But the company received neither one nor the other. Tanks versus carriages Almost two-thirds of Uralvagonzavod’s revenue for the first half of the year came from production military equipment, the rest is the production and operation of railway cars. But in the second half of the year, the share of railcars in revenue will increase, Burmistrov predicts.

Electronic form for receiving applications (online reception)

Dear users! We ask you to carefully read the procedure for receiving and considering electronic appeals through the “Public Reception” section of the official website Federal service for environmental, technological and nuclear supervision of the Russian Federation (hereinafter referred to as Rostechnadzor). 1. The “Public Reception” section of the official website of Rostechnadzor is an additional means for providing the opportunity for citizens to contact Rostechnadzor. 2. Appeals from citizens received electronically are considered in accordance with Federal law dated May 2, 2006 No. 59-FZ “On the procedure for considering appeals from citizens of the Russian Federation.”

3. Electronic requests received with incomplete or inaccurate information about the sender, without an email address, are not subject to consideration. 4.

Gas / Gasification and gas supply

The previous owner of the apartment connected the gas hob and oven through one tap. Now gas workers require reconnection through two taps. What are these requirements based on? And should the current owner pay for the work to redo the gas distribution?

MOSGAZ requires installing two separate taps on the hob and oven. On what basis?

Question: Good afternoon! I received a notification from MOSGAZ about the elimination of violations. Violation: The hob and oven are installed on the same locking device! At the time the decision was made, I did not live at this address. How should I eliminate this violation in accordance with the technical specifications? Thank you!

Answer: Dear Alexey Alexandrovich! In response to your request dated December 5, 2016, MOSGAZ JSC reports the following.

Gas appliances are installed in accordance with the Moscow standard for the operation of housing stock ZhNM-2004/03 “Gas pipelines and gas equipment residential buildings”, approved and put into effect by Decree of the Moscow Government dated November 2, 2004 No. 758-1Sh.

Based on clause 3.5 of the specified standard, disconnecting devices are installed in front of each gas appliance.

Therefore, when installing a gas hob and an independent gas oven it is necessary to install a second disconnecting device. This requires alteration of the intra-apartment gas distribution.

To redo the gas distribution, you can contact Department No. 1 of JSC "MOSGAZ" for the operation and repair of gas facilities (address: Grafsky lane, 12, telephone 8 (495) 687-63-93) or leave a request on the official website of the JSC "MOSGAZ" (www.mos-gaz.ru). Employees of this department With a visit to the site, they will draw up a sketch for altering the gas pipeline, issue an invoice based on the scope of work and conclude a contract for the work. Once the invoice is paid, the work will be completed.

Calculation of the cost of alteration of gas distribution and installation of gas appliances is carried out on the basis of Territorial Estimate Standards for Moscow (TSN -2001), put into effect by Decree of the Moscow Government dated November 14, 2006 No. 900-PP. There are no benefits provided.

At the same time, we inform you: responsibility for the safe use of household gas appliances, for their maintenance in proper condition and repair lies with the owners and tenants of residential premises (Article 210 of the Civil Code of the Russian Federation, Article 30.67 of the Housing Code of the Russian Federation).